靠谱的十大网投实体平台-澳门官方十大网投平台

靠谱的十大网投实体平台-澳门官方十大网投平台

Project Owner

American Airlines

Project Location

Los Angeles International Airport, CA

Project Delivery Method

Design-Bid-Build

Project Details

必发365手机登录 has been contracted to complete hydrant fuel pit modifications for the Terminal 4 (T4) Gate Enhancement Project at Los Angeles International Airport. The project includes the installation of new hydrant pits and associated lateral piping to facilitate revised aircraft parking configurations. 必发365手机登录 is executing all aspects of the fueling system modification scope including system drain-down, new pit/lateral installation and the testing/flushing of all installed components.
Back to top