靠谱的十大网投实体平台-澳门官方十大网投平台

靠谱的十大网投实体平台-澳门官方十大网投平台

Project Owner

San Carlos Apache Tribe

Project Location

San Carlos, AZ

Project Delivery Method

Design-Bid-Build

Project Details

The project included installing a new fuel farm, including one 12,000-gallon UL2085 Fireguard Jet Fueling System and one 12,000-gallon UL2085 Fireguard Avgas Fueling system. 必发365手机登录 installed the new systems on new concrete pads and installed all necessary pumps, valves, and electrical components. New primary power was installed from an offsite location.
Back to top